Operation & maintenance of YONGLI hammer mill

YONGLI hammer mill feeding operation should be uniformed, can not be erratic, ensure the motor at rated load. Opening the free door is prohibited in the production process. In the normal production process, opening any coupling guards is forbidden.
    Grinder during operation if unusual noise or blocked discharge, bearings or motor overheating, should stop feeding, cut off the power, check until the rotor stops, troubleshooting. After the work is completed, must be idle for 2 minutes, the machine crush the material completely discharged before being shut down. Instead shutdown and startup sequence. After the shutdown of the mill be down to check, identify problems promptly resolved. It must be cleaned of magnetic impurities mill entrance magnetic board.
    YONGLI hammer mill arranged symmetrical arrangement form, hammer when installed, must be in strict accordance with the arrangement, and the corresponding hammer weight difference of the two groups can not be more than 5 grams. After sharp blunt hammer, you can use a reverse angle adjustment (reversing every day can achieve hammer simultaneously wear two sharp corners). If the hammer two sharp corners are worn, they should use a U-turn. When a U-turn, should hammer all at the same time, to keep the balance of the rotor. After the corners are worn, replace them with new hammer, which arrangement should be strictly in accordance with the instructions of, and each hammer weighed. In the hammer wear late due to uneven wear, so out of balance grinder, vibration intensified, this time should be corrected rotor static balance, reassembled or replaced with new hammer hammer. Sieve size should be based on the requirements of crushed material to choose the appropriate mesh sieve. It should be replaced after sieve wear or damage. Installation screen films, sieve with a burr in the side should be, smooth outwards, screen films and screen frame are linked closely together.
   Mill maintenance should be strictly in accordance with the rules to operate, the class must make the necessary checks. You should always check on the cotter pin, if excessively worn or broken, replace it immediately. It should be regularly inspected, cleaned (100 hours) and lubricate the bearings. Machine parts found severe wear and damage should immediately repair and replacement of the rotor after the repair should be balancing test. Class after work, both inside and outside the machine should be cleaned to remove dust and dirt in order to avoid rusting machinery, sieve clogged inner bearing into the dirt.

评论

此博客中的热门博文

YONGLI sawdust pellet line

Check out this video, our lovely engineer Dave made a rough lecture on sawdust pellet production. His smile will bring you a nice day !

YONGLI small animal feed plant

Yongli feed pellet mill is suitable for producing 500-15000kg/h poultry feed, livestock feed and ordinary fish feed in small feed. Feed unit contains various section of feed production equipment, from the crushing, mixing, granulation, cooling, screening, lifting and conveying to control system. The whole equipment is fixed on the frame, the simulation of centralized control panel. All the equipment to take the interlock control, and is equipped with the security alarm device, the operation is simple. The construction time is short, and the semi-automatic advanced feed mill is short. Its features: easy to install, easy to operate, centralized control. A variety of technical process to choose. Because of its low investment and quick effect, it is an ideal equipment for the whole set of equipment.

YONGLI finished production workshop